Uncategorized

Carlsberg MES Project – In-line and At-line Quality Results Recording & Reporting

The Carlsberg Group Carlsberg Breweries, headquartered in Copenhagen Denmark initiated a supply chain management improvement process with a best practice program in 2006.The Carlsberg Group, headquartered in Copenhagen, Denmark, is one of the leading brewery groups in the world, with a large portfolio of beer and other beverage brands.The flagship brand – Carlsberg – [...]

Carlsberg MES Project – In-line and At-line Quality Results Recording & Reporting2025-09-29T09:53:58+00:00

Precision painting with Dürr at Volkswagen

Car manufacturers can invest up to Euro 100 million for a new paint shop. An investment not to be sneezed at which means the system must work hard for many years to be worthwhile. Dürr is the world’s leading supplier of paint shop systems for automotive manufacturers and at their headquarters in Stuttgart, Germany only [...]

Precision painting with Dürr at Volkswagen2025-04-22T12:36:59+00:00

Visteon – Airbags

Airbags Blow Up Safely with Best Practices in the Automotive Industry Visteon Berlin produces instrument panels for the latest Ford Car. The panel has an invisible door for the airbag and the door must operate properly if the airbag is activated. In this project state of the art software is implemented to track the production [...]

Visteon – Airbags2025-04-22T14:02:25+00:00

MES System for Cadillac doors line

When designing a system to run a production line which must fulfill orders with only 3 hours notice, the possibility of carrying inventory is non-existent and the impact of failure is enormous, you must think hard about the solution you come up with. This was case early last year when Faurecia engaged ATS to design [...]

MES System for Cadillac doors line2025-04-22T11:15:22+00:00

Faurecia Line Flexibity Project

When you’ve designed a production line to meet a given output level and your customer demand reaches more than double that level, you’re working three shifts, seven days a week and you still can’t keep up, you need to take action. You essentially have two choices – you invest in a second line or you [...]

Faurecia Line Flexibity Project2025-04-23T07:45:14+00:00

Case Study: New Factory Integration

Blue Cedar | Working with a system integrator, this project was ultimately for a major beverage manufacturer building a brand new plant at a small town called Ballina in the Irish Republic.We were brought into the project at an early stage early by the principle system integration contractor to create the documentation that would be [...]

Case Study: New Factory Integration2025-04-22T13:51:16+00:00

Case Study: Process Improvement Unilever Purfleet

Blue Cedar | This project involved inserting a new manufacturing line into an existing production environment. We worked directly for Unilever's own manufacturing improvement projects department.As with the majority of projects, the work was kicked off with a project meeting, gathering together relevant stakeholders, in this case including the project management team, ourselves and senior [...]

Case Study: Process Improvement Unilever Purfleet2025-03-24T14:40:59+00:00
Go to Top