Switch Datacenters Selects ATS DCIM for New Data Center Build

Purpose

  • Customer required innovative modular solutions for building a datacenter with state-of-the-art facility, spanning 7,400 square meters represents a seamless fusion of innovative design and advanced technology setting new benchmarks in reliability & efficiency and Our DCIM solution was a perfect fit for the project.
  • One of the primary challenges was to complete a brownfield data center build within a 12-month timeframe, adhering to the design specifications.
ATS Success Story arrow Image
ATS Global - Customer Story - Switch Datacenters - website image

Solution Approach

  • We adopted a “design during build” method which allowed for simultaneous design and construction activities. This approach enabled us to efficiently manage the project timeline.
  • ATS DCIM system a cornerstone of this project serves as the nerve center providing centralized real-time monitoring, incident detection and preventative measures to ensure uninterrupted operations and a modular software system was delivered, leveraging an asset library and the automated software generation tool- Project Builder.
  • This approach ensured that the system was efficient and tailored to meet the specific needs of the project.

Systems & Tools

  • ATS DCIM Solution

The Results

High reliability with minimal capital investment, the site boasts an impressive reliability rate of 99.999%.

Time to out-performs market standards.

Innovative cooling system with high availability, designed to be 100% fail safe.